Jump to content
  • Sign Up Now!

     

    • Join in discussions about all the latest innovations in mobile phones, gadgets, computer, hardware, software and latest games.

     

     

  • Upcoming Events

    No upcoming events found

Forums

  1. Mugen Forums

    Chit-Chat

    • 314.4k posts

    Casual lounge for your daily banter!

    Techies and Gamers

    • 2.4k posts

    All about Technology and Gaming!

    Cars & Stuff

    • 339 posts

    Fast not furious!

  • Chatbox

    Load More
    You don't have permission to chat.
  • Posts

    • SINGAPORE – The MRT network’s reliability fell for the second consecutive month as at the end of September, compared with August, based on the latest figures from the Land Transport Authority (LTA) released on Nov 14. On average, MRT trains clocked 1.67 million train-km between delays that lasted more than five minutes between October 2024 and September 2025. This is down from an average of 1.74 million train-km between September 2024 and August 2025. For the first time, LTA on Nov 14 also published data on three new indicators of reliability and passenger experience to provide a fuller picture of rail performance. One of them, on the punctuality of the MRT network, showed that 99.16 per cent of trains ran on time in September.     The other indicators showed the impact of train disruptions on passengers, and the proportion of train services that operated according to schedule. In September, there were two major disruptions exceeding 30 minutes on the MRT network – one on the Circle Line (CCL) on Sept 1, and the other on the East-West Line (EWL)on Sept 16. On the LRT network, there was a major three-hour disruption on the Punggol LRT line on Sept 13.   The North-South Line (NSL), run by public transport operator SMRT, was the only MRT line that fared worse than the moving average in the previous month, according to the LTA report.   It clocked 1.24 million train-km between delays as at September, down from 1.65 million train-km in August, becoming the least reliable line of the MRT network.   A disruption from Woodlands to Yishun occurred on the NSL because of a train fault on the evening of Sept 2, delaying the journeys of passengers travelling from 8.05pm to about 8.50pm. Around noon on Sept 14, another disruption took place from Newton to Ang Mo Kio. Passengers travelling along the affected stretch from 11.44am to 12.21pm had to factor in extra travelling time.     In both these instances, SMRT was able to resume services partially in under 30 minutes. The Downtown Line (DTL) remained the best-performing among the five lines whose figures were included, logging 2.77 million train-km between delays as at September, an improvement from 2.76 million train-km in August. In second place was the North East Line (NEL), which experienced an increase in reliability, having travelled 2.16 million train-km between delays, up from 2.14 million train-km. Public transport operator SBS Transit (SBST) operates both the DTL and NEL. The EWL emerged third, posting 1.7 million train-km between delays, an increase from 1.68 million train-km the previous month. The CCL was no longer the least reliable line, coming in second-to-last with 1.49 million train-km travelled between delays, up from 1.25 million train-km. SMRT runs the EWL and CCL. The figures are based on a 12-month moving average of mean kilometres between failure (MKBF), which captures the distance a train travels before encountering a delay of more than five minutes. It does not account for the severity of disruptions.   Singapore has an MKBF target of one million train-km for the entire MRT network. This is the second monthly rail reliability report that LTA has released, as it moves away from publishing these numbers quarterly, in an effort to improve transparency and accountability. The SMRT-run Thomson-East Coast Line (TEL) was not factored into the overall reliability figure as it is not fully open. It will be included in the overall MKBF figure about one year after its fifth phase – comprising the Bedok South and Sungei Bedok stations – opens in the second half of 2026. Reliability figures for TEL showed that the newest rail line posted 287,000 train-km between delays as at September, down from 311,000 train-km in August. The authority reiterated that the teething issues for TEL will take time to stabilise as they require LTA and SMRT to work with the original equipment manufacturers to resolve. While these teething issues – including problems with its signalling system – could result in delays, LTA pointed out that the nature of such delays is different from those encountered during the operation of mature rail lines. On the LRT front, overall reliability increased, with an average of 474,000 car-km recorded between delays as at September, up from 420,000 car-km in August. The Sengkang-Punggol LRT, operated by SBST, clocked 842,000 car-km between delays, up from 840,000 car-km in August. The SMRT-run Bukit Panjang LRT posted 253,000 car-km between delays, up from the 209,000 car-km recorded in August. With at least 15 rail disruptions between July and September, the reliability of the train network has been in the public spotlight. The spate of breakdowns have prompted the Government to form a rail reliability task force that will submit its final recommendations by the end of 2025.  
×
×
  • Create New...

Important Information

Mugentech.net uses cookies to ensure you get the best experience on our website. By using this site you agree to Privacy Policy