-
Upcoming Events
No upcoming events found
-
Posts
-
this was the best that showed up in recommended first page .. what to do weekend coming so can be exotic wildcard
-
More green spaces to be retained in Gillman Barracks, Maju Forest: Alvin Tan https://www.straitstimes.com/singapore/more-green-spaces-in-gillman-barracks-maju-forest-to-be-retained-alvin-tan?fbclid=IwdGRjcATrtG5wZG9mBWV4dG4DYWVtAzEwMABzcnRjBmFwcF9pZAwzNTA2ODU1MzE3MjgAAR5PcAiudQBi-Sd-dGYtAuc7CavZDl18cBk_VHrxlJzzXbkuUlf0rbrjohaB7g_aem_aE_caL9PIbDjAMBYyWol5g Full Details: More Green Spaces to be Retained in Gillman Barracks, Maju Forest: Alvin Tan Source: The Straits Times | By Isabelle Liew | Published Aug 14, 2026, 1:30 PM; Updated Aug 14, 2026, 4:21 PM 📢 Official Announcement Minister of State for National Development Alvin Tan announced on Aug 14, 2026 that additional greenery will be preserved at Gillman Barracks and Maju Forest, in response to public feedback received (feedback closed Aug 6). He noted this trade-off: fewer homes can be built on both sites compared to initial plans. Authorities aim to finalise revised plans within the coming month, with further public engagement. 📋 Initial vs Revised Proposals - Original plans: Retained 40% green space at Gillman Barracks and 35% at Maju Forest, drafted with input from nature groups. These were never final. - Adjustments: More greenery than the above percentages will be kept; exact figures still being worked out. 🌱 Suggestions & Requests Received Gillman Barracks: - Nature groups sought a wider central green corridor to improve ecological connectivity linking to Telok Blangah Hill Park, Labrador Nature Reserve, and HortPark. - Initial proposal had 30m-wide ecological corridors; conservationists warned this could restrict species that historically ranged over larger areas. Maju Forest: - Nature groups requested a wider, continuous vegetated corridor to support animal foraging. - Nature Society Singapore (NSS) President Leong Kwok Peng hopes to raise retention to two-thirds (~67%) from the planned one-third (~33%), suggesting merging the northern freshwater stream zone with southern greenery to create a larger forest block. He noted even this may still negatively impact biodiversity. - Residents & public also called for more green space preservation. - NSS had been consulted when HDB first released plans July 10, 2026; committee member Lester Tan described keeping one-third as the "minimum compromise" between housing and conservation. 🏛️ Parliamentary Context Earlier in August, Minister Tan told Parliament plans were unfinished but highlighted the need to develop these sites to meet Singapore’s housing demand over the next decade. 19 MPs raised questions covering: balancing housing needs & environmental protection, public feedback efficacy, and planning transparency. 💬 Public Reaction - Residents: Many living nearby strongly opposed losing green spaces—submitting proposals, organising dialogues, and petitioning MPs. - Carmen Tang (Sunset Way resident): "Clementi is already quite densely populated… I’m glad the Government is listening." - Low Guo Xiang (local resident): Praised the cooling, wind benefits of the forest; hopes for full retention but welcomes improvement. - Jessica Boon (Telok Blangah): Urged saving more Gillman Barracks greenery, noting nearby former Keppel Club land already cleared for the upcoming Berlayar estate. - NSS response: Leong Kwok Peng said he was "shocked and heartened" by the strong public support, including youth and MPs championing the cause. 📌 Key Summary ✅ Outcome: More green space retained → fewer new homes built ✅ Next step: Finalise detailed plans in ~1 month ✅ Core tension: Meeting long-term housing needs vs preserving biodiversity, ecological corridors, and community green spaces
-
Alright — let’s look at this with a critical eye, unpacking the fine print, definitions, and gaps that the headline doesn’t shout about. 🧐 📏 1. The metric is carefully defined — and narrow - The "9 months without delay exceeding 30 minutes" only counts delays >30 minutes — meaning every delay of 5–29 minutes is excluded from this "perfect streak" claim. - MKBF measures distance before a delay over 5 minutes — but doesn’t weigh how many people are affected, when it happens, or how severe the disruption is . As transport economist Walter Theseira put it: "If a train breaks down with hardly any commuters on board, did it really happen? … A breakdown at 8.30am at Punggol will affect thousands." — yet both count the same in the stats . - It’s a 12‑month moving average — so monthly spikes get smoothed out, and the figure lags real‑world experience. - June figures were revised downwards after investigation — showing stats are adjusted after the fact, and what’s published as "provisional" can change. 🚇 2. TEL is deliberately excluded — a very convenient omission - TEL is Singapore’s newest, still‑expanding line — and it’s kept out of the "overall network" reliability numbers . - Even though it’s carrying passengers daily, its far lower MKBF (~373k vs 2.37M for mature lines) never drags down the headline . - LTA’s stated reason: teething issues + partial opening — but the public still rides it and experiences those delays . The "network" as commuters know it is bigger than the one in the press release. 🤐 3. Reporting rules changed — less transparency for smaller delays - Since Dec 2025, delays under 30 minutes are only announced locally at affected stations — not via network‑wide alerts/apps/social media. - Critics argue this hides disruptions that are still very annoying, especially for long‑distance commuters who could switch lines if they knew. - Some incidents were reclassified mid‑incident — from "major" to "minor" once resolved within 30 minutes — raising questions about whether definitions serve passengers or performance metrics. 📉 4. Other indicators tell a softer story - While "no >30min delays" looks great: - Service delivery dipped: 99.71% in July vs 99.82% in June — still high, but down. - Punctuality also fell slightly: 99.29% vs 99.32% — and lines like DTL dropped noticeably (99.83% → 98.84%). - High percentages don’t mean zero hassle: 0.3%–1% shortfalls still translate to thousands of passengers affected across a system moving millions daily. - Experts have long noted MKBF alone doesn’t capture commuter pain — frequency, peak‑hour impact, crowding, and knock‑on delays are invisible in that single number . ⏳ 5. Context: Reliability has swung wildly before - Just months ago (mid‑2025), there were 15 major disruptions in 3 months, prompting the formation of the Rail Reliability Taskforce . - The oldest lines (NSL/EWL) are over 40 years old — gains are fragile, and aging infrastructure remains a long‑term risk that recent good months don’t erase . - Past "record streaks" have ended abruptly — resilience over years, not months, is what matters. ✅ Balanced take The improvements are genuine and commendable — maintenance, upgrades, and taskforce efforts are showing results. But the headline is polished: it picks a high threshold, excludes the struggling new line, smooths data over a year, and pairs well with less visible reporting on smaller delays. The truth sits somewhere between: "Remarkable consistency on one strict definition" and "Better, but still imperfect — and some delays are quietly kept out of view."
-
🚇 Singapore's MRT network has gone 9 straight months without a delay exceeding 30 minutes – its longest streak since records began in 2011. These figures exclude the Thomson-East Coast Line, though: https://cna.asia/45w8Gp4 🚇 Full Details: Singapore MRT’s Record Reliability Streak Source: CNA / Land Transport Authority (LTA) report published 14 Aug 2026 ✅ Key Milestone - 9 consecutive months (up to July 2026) with no delays exceeding 30 minutes — longest streak since LTA started tracking this metric in 2011 - Exclusion: Figures do NOT include the Thomson-East Coast Line (TEL), which is still under construction, extension & system integration while operating 📊 Core Metric: Mean Kilometres Between Failures (MKBF) Definition: Average distance a train travels before a delay over 5 minutes; higher = more reliable. Based on 12-month moving average. - Overall network (excl. TEL): Rose to 2,370,000 train-km in July 2026 (up from revised 2,360,000 train-km in June) → 4th straight month above 2 million train-km - June revision: NSL delay on 11 Jun reclassified as >5 mins → adjusted figures updated By individual lines (July 2026): - 🟢 North East Line (NEL): 4.47 million (up from 4.46M) - 🟢 Downtown Line (DTL): 4.20 million (unchanged) - 🟢 Circle Line (CCL): 2.45 million (improved from 2.40M) - 🟢 East-West Line (EWL): 2.02 million (unchanged) - 🟢 North-South Line (NSL): 1.65 million (unchanged post-revision) - ℹ️ TEL: 373,000 train-km (up from 355,000; not counted in overall network due to ongoing works) 🚆 Other Reliability Metrics 1. Train Service Delivery (% running as scheduled) - Overall: 99.71% in July (vs 99.82% June) - NSL: 99.99% | EWL: 99.96% | NEL: 99.89% | CCL: 99.52% | DTL: 99.20% 2. Train Punctuality (% trips on time / within ±2 mins) - Overall: 99.29% in July (vs 99.32% June) - NSL: 99.69% | EWL: 99.85% ↑ | NEL: 99.46% ↑ | CCL: 98.59% ↑ | DTL: 98.84% ↓ 💡 Why the Improvement? - Sustained efforts by LTA + operators SMRT & SBS Transit - Implementation of recommendations from the Rail Reliability Taskforce (Feb 2026) - Focus on maintenance, fault response & system upgrades
-
