Search the Community
Showing results for tags 'shipping'.
-
Sembcorp Marine secures Cambo FPSO design contract Singapore’s Sembcorp Marine has been awarded a front-end engineering and design contract with Siccar Point Energy for an FPSO for the Cambo field in the UK Continental Shelf. The design will be based on Sembcorp Marine’s Sevan geostationary circular hull, eliminating the need for a costly turret while accommodating a larger number of risers and flexibility for future tie-ins. https://splash247.com/sembcorp-marine-secures-cambo-fpso-feed-contract/